For steel frames & truss works
Rust Shield®
Block moisture. Stop rust. Protect steel.
For steel door frames, window frames, truss works and fabricated steel. The rust has to come off before the coating goes on — everything after that is two even coats and a cure.
- 6 steps
- 2 coats
- Direct apply
- Recoat 2–3 hrs
- Hard dry 5–8 hrs
Applying Rust Shield, step by step
-
01 Step 1 of 6
Remove rust and clean the steel
Take the corrosion back to sound metal. A wire brush, sandpaper or any suitable cleaning method will do it.
Remove all existing rust with a wire brush, sandpaper or emery.
Take off loose mill scale, flaking paint and weld spatter as well.
Degrease: the surface must be free from oil, grease, dust and loose particles.
The steel must be dry. Never coat a wet surface.
Back to sound, bright metal
-
02 Step 2 of 6
Stir well before use
The protective solids settle while the tin stands. Stir from the bottom until the colour and the body are even the whole way through.
Stir thoroughly, lifting from the bottom of the tin, every time you start.
Do not thin it. RUST SHIELD is direct apply — no primer needed.
Close the container tightly after use.
Work in a well-ventilated area, in goggles, mask and gloves.
Direct apply — no primer, no thinner
-
03 Step 3 of 6
Apply using brush or roller
An even coat straight onto the cleaned metal. The joints and the buried faces matter more than the face you can see.
Lay an even coat with a brush or roller — no primer first.
Cover the contact area between the wall and the metal frame.
Work the coating into welds, corners, cut ends and fixing holes.
Do not apply on wet surfaces or during rain.
First coat
-
04 Step 4 of 6
Allow to dry 2–3 hours
Let the first coat dry before the second goes on. Two to three hours is the recoat window; humid weather takes the long end of it.
Stand the frame where air reaches every face while it dries.
Keep it out of rain, spray and settling dust.
Touch-test a hidden edge: dry, not tacky, before you recoat.
Do not force-dry with heat.
2–3 hrs before the second coat
-
05 Step 5 of 6
Apply the second coat
The second coat is what closes the barrier over the metal. Same method, same attention to the joints.
Same even coat, over every face the first coat reached.
Check welds, corners and the wall-contact area again for thin spots.
Do not stop at one coat — the film needs both to seal properly.
Close the tin tightly as soon as you are finished.
Second coat
-
06 Step 6 of 6
Cure, then install
Allow 5–8 hours for a hard dry. Install or finish the frame only once the coating has properly cured.
5–8 hours for a hard dry before handling, fixing or finishing.
Water should run straight off the coated metal instead of clinging to it.
Touch up any scratch from handling before the frame is built in.
Store the remaining tin closed, cool, dry and out of direct sunlight.
Hard dry 5–8 hrs
Reference
Timings & safety
Timings
- Coats
- 2
- Recoat after
- 2–3 hrs
- Hard dry
- 5–8 hrs
- Primer
- None
- Net content
- 1 Litre
Safety
- Avoid contact with eyes and skin.
- Wear goggles, a dust mask and gloves.
- Do not breathe in vapour or spray.
- Use in a well-ventilated area.
- Keep out of reach of children.
Storage
- Close the container tightly after use.
- Store cool and dry, out of direct sunlight.
- 24 months unopened, from the date of manufacture.
- Coverage varies with surface condition, roughness and film thickness.
Unsure about a junction on your site?
Send us a photo and the substrate and we will tell you which product to use and how much you need.